Information letter week 25-26 2025 - Project Pussen

Details

Utemiljö (B0011000)

During week 25:
• Restoration of ground slabs on the walkway north of Universitetsvägen.
• Backfilling of the overpass at Universitetsvägen prior to laying ground slabs and paving stones.
• Removal of asphalt on the pedestrian and bicycle path between the dam and the parking lot.
• Excavation and backfilling work begins on part of the old parking lot.
During week 26:
• Restoration work on the footpath south of Universitetsvägen, in parallel with the restoration of the paving stones on Universitetsvägen.
• The wooden house by the pond is removed.
Status from week 24:
• Soil samples were taken and sent for analysis. If the results show a good outcome, we will begin work on the planned grass area in the old parking lot.